factory Outlets for Machine For Separating Waste - Open Mechanized Moulding Line – Kailong Machinery Detail:
◆Walking Beam Mould Conveyer
This machine is an open walking beam mould conveyer used in the foundry. It makes moulding, core filling, mould assembling, pouring, and flask falling, these processes be completed in an main line, only cooling in other lines. It is much more suitable for the production arrangement for long time cooling cast, and it can be done in a centralized area without space waste. So it is one of the necessary parts in moulding line with flask.
The Specification Of Open Mechanized Moulding Line
Model | Dimensions of Flasks | Size of Pallet Car | Pitch of Pallet Car | Number of Flasks/ Every Pallet Car |
Remarks |
KXZ80 | 800*630*300/300 | 1000*750 | 1200 | 1 | |
KXZ90 | 900*700*300/300 | 1100*800 | 1300 | 1 | |
KXZ100 | 1000*800*350/350 | 1200*900 | 1400 | 1 | |
KXZ120 | 1200*900*400/400 | 1400*1000 | 1600 | 1 | |
KDX3 | 500*420*150/150 | 1800 | 3 | it is suitale for walking-type cast conveyor | |
KDZ2 | 720*450*200/200 | 1500 | 2 |
Product detail pictures:
Related Product Guide:
Injection Moulding Design and Tooling
How Does an Injection Moulding Machine Work?
We insist on offering high quality production with good business concept, honest sales and the best and fast service. it will bring you not only the high quality product and huge profit, but the most significant is to occupy the endless market for factory Outlets for Machine For Separating Waste - Open Mechanized Moulding Line – Kailong Machinery, The product will supply to all over the world, such as: Naples , Korea , Comoros , With the technology as the core, develop and produce high-quality merchandise according to the diverse needs of the market. With this concept,the company will continue to develop merchandise with high added values and continuously improve items,and will present many customers with the best goods and services!
By Matthew from Canada - 2017.05.02 18:28
This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
By Yannick Vergoz from Guinea - 2017.03.08 14:45